An innovative NEC4 Engineering and Construction Short Contract (ECSC) was used to deliver a sustainability-focused refurbishment of a Grade II listed building in central London. Opened in 1913, One Great George Street in Westminster is the prestigious headquarters of the Institution of Civil Engineers (ICE) and an award-winning events venue. NEC4 ECSC offered a straightforward yet collaborative contract for the refurbishment, allowing contractor design during delivery. Its flexibility also enabled inclusion of a tailored Option X29 on climate change to support stronger sustainability outcomes. Read more: https://www.neccontract.com/projects/one-great-george-street-refurbishment-london-uk

Posted by Panumas from NEC Contracts at 2025-07-22 09:49:21 UTC