NEC is excited to launch its first international language translation of NEC4 contracts, guides, and training into Spanish, in collaboration with the Ministry of Economy and Finance (MEF) for Peru. The new translation of the NEC4 Engineering and Construction Contract (ECC) and its associated user guides, along with the Introduction to the NEC4 ECC online training course, will all be available from April. This translation is a key milestone in the ongoing partnership between NEC and MEF, which began in 2024 when NEC suite of contracts was officially adopted as Peru’s preferred contract framework for infrastructure projects. #contract #engineering #peruinfrastructure #infrastructure #engineering #construction #procurement #spanishtranslation
Posted by NEC Contracts at 2025-03-11 10:11:57 UTC