Learn about how NEC Contracts and its secondary Option X29 is enabling the UK Environment Agency (EA) to drive towards achieving net-zero by 2030. The EA was at the NEC Annual Conference 2024 last week and gave a presentation on the NEC-based collaborative delivery framework. Speakers are from EA, AtkinsRéalis, the Department for Environment, Food and Rural Affairs (DEFRA) and VolkerStevin. Watch the video on our YouTube channel here below. #sustainability #climatechange #netzero
Posted by Panumas from NEC Contracts at 2024-07-01 09:39:24 UTC