The Highways Department, HKSARG has adopted an NEC3 Engineering and Construction Contract (ECC) for widening a section of Lin Ma Hang Road, an important route next to mainland China. The works involved widening of a 750 m long section of Lin Ma Hang Road at Ta Kwu Ling in the North District, including construction of a new bridge over Ping Yuen River using a design-for-manufacture-and-assembly (DfMA) method, with bridge piers manufactured off-site in mainland China.
Posted by Hawa S at 2024-05-30 06:00:01 UTC