The NEC Engineering and Construction Contract (ECC) Hong Kong Edition takes full advantage of the features of the standard contract while adapting it to suit local legislation, procurement practices and dispute resolution. Hear from NEC tutor and consultant Tim Knee-Robinson as he discuss the key differences between the NEC4 ECC and the NEC ECC Hong Kong Edition. View here: https://www.youtube.com/watch?v=vxE_4QUECt0

Posted by Hawa S at 2024-04-08 08:51:51 UTC