NEC Users’ Group platinum member National Highways has let the last of six NEC Contracts worth a total of £3.5 billion for the proposed Lower Thames Crossing in Kent and Essex, UK. The two 4.3 km long, 16 m wide bored tunnels will be the longest road tunnels in the UK. On completion in 2032, they will form part of new 23 km dual-three-lane road link between the M25 near South Ockendon in the north and the A2/M2 near Strood in the south. #transport #motorway #road #nationalhighways
Posted by Panumas from NEC Contracts at 2024-03-14 14:21:21 UTC