Take a look at the interviews from the NEC Asia Pacific Conference 2023. Speakers and delegates shared their experience in attending the conference, the use of NEC Contracts including the ECC Hong Kong Edition and the NEC4 Engineering and Construction Accreditation training course.
Posted by Hawa S at 2024-01-23 07:00:01 UTC