NEC Users’ Group gold member Yorkshire Water has used NEC to improve water quality at its Embsay water treatment works near Skipton in northern England. The £7.7 million design and construction project was let to the contractor Mott MacDonald Bentley under anNEC4 Engineering and Construction Contract (ECC) Option A (priced contract with activity schedule) in May 2022. The 50-year-old, 24 Ml/day water treatment works provides drinking water to over 15,000 people in Skipton and the surrounding areas. The project involved building a new subterranean contact tank with an interstage pumping station and new manganese filters, plus converting the existing contact tank into a start-up-to-waste facility. It has reduced risks to water quality from manganese, cryptosporidium and disinfection byproducts and improved long-term resilience of the local water supply. #waterprojects #watertreatment #nec4 #carbonreduction
Posted by Panumas from NEC Contracts at 2024-01-23 13:30:05 UTC