Here are some of our upcoming training dates for the NEC4 Project Manager Accreditation. This programme is designed to equip delegates with the skills necessary to be able to manage a project under an NEC4 Contract, with specific reference to role and importance of the Project Manager under the NEC4 Engineering and Construction Contract (ECC). #training #engineering #projectmanager #nec4 #accreditation
Posted by Panumas from NEC Contracts at 2024-01-11 13:34:04 UTC