The ‘mutual trust and co-operation’ obligation under clause 10 of both NEC3 and NEC4 contracts lies at the core of the NEC contract suite. Initially introduced in the 1995 NEC second edition after the Latham Report (1994), the so-called ‘clause 10 duty’ has survived two major reviews yet its scope remains undefined. This article aims to explore the potential meanings and scope of the clause 10 duty.
Posted by Panumas from NEC Contracts at 2023-11-01 13:13:08 UTC