NEC contracts are being used to deliver over 70 British Army accommodation blocks in the UK that have net zero greenhouse gas emissions and feature modern methods of construction (MMC). The use of modern methods of construction has also substantially reduced onsite construction waste by 80%. The £85 million building programme has won numerous awards including the prestigious Environmental Project of the Year award in the 2022 British Construction Industry Awards. The Net-Zero Carbon Accommodation Programme (NetCAP) is being delivered through the National Training Estate Prime Contract, with Defence Infrastructure Organisation (DIO), Landmarc Solutions and Reds10. The blocks were manufactured, fully assembled and tested in Reds10’s factory in Driffield, East Yorkshire. They were then disassembled and delivered as individual modules to a total of 13 Training Estate bases across England. #modularconstruction #modulardesign #offsiteconstruction #mmc #modular #netzero
Posted by Panumas from NEC Contracts at 2023-10-19 12:00:02 UTC