The Civil Engineering and Development Department (CEDD), Hong Kong Government is an experienced user of NEC and chose NEC3: Engineering and Construction Contract Option A for design and build. The HK$1,480 million (£148 million) contract with Penta-Ocean Construction Company Limited involved the design and construction of a 1.1 km dual two-lane distributor called Road D3 (Metro Park Section), with 250 m at grade, 360 m elevated over the new Central Kowloon Route and 520 m in a cutting through the future Metro Park. The latter is partially covered by a 200 m long elevated landscaped deck. The works also included a saltwater pumping station and sewage pumping station for future residential development, 3.9 ha of landscaped open space and a waterfront promenade. #hongkong
Posted by Hawa S at 2023-10-17 05:00:06 UTC