Oxygen Train 17 at international chemical and energy company Sasol’s Secunda operations in Mpumalanga, South Africa is the largest oxygen production unit in the world. Producing 5000 t per day, Air Liquide’s giant air separation unit was integrated into Sasol’s synthetic fuel and chemical manufacturing operations using 20 NEC contracts. The oxygen production unit has an energy storage system that helps facilitate more renewable energy on the electricity grid. #renewable #cleanenergy #netzero #fromthearchive #DrivingOurRenewableFuture #GreenFuture
Posted by NEC Contracts at 2023-09-08 14:30:45 UTC