NEC has been used for a site formation project in Hong Kong that was completed in just 20 months, under an NEC3 Engineering and Construction Contract (ECC) Option B (priced contract with bill of quantities). The 2 ha of site formation works for public housing development included felling 782 trees, excavation and disposal of 54,000 m3 of soil, construction of a 187 m long bored pile retaining wall, modification of an existing pedestrian and cycle bridge, construction of a lift tower for the modified bridge, drainage and sewerage works, road improvement works and landscaping. Read the full case study here: https://www.neccontract.com/projects/wu-shan-road-site-formation-tuen-mun-hong-kong #hongkong
Posted by Hawa S at 2023-09-08 08:48:36 UTC