Over the next coming weeks NEC will be shining a spotlight on the amazing projects in the renewable energy sector using NEC Contracts. From hydropower, solar to biomass energy, our NEC4 Contracts including the Engineering and Construction and Professional Services Contracts have been instrumental in shaping the future of sustainable energy. #renewable #RenewableEnergy #wind #solar #hydropower #biomass #netzero
Posted by NEC Contracts at 2023-08-22 13:19:20 UTC