SMP Alliance won both the NEC Transport and Contractor of the Year awards for designing and constructing smart motorway works for England’s National Highways. The contractor is engaged under a £2 billion NEC4 Alliance Contract (ALC) running from 2020 to 2030. Watch the video here: https://www.youtube.com/watch?v=34YtV1o5OmA
Posted by Panumas from NEC Contracts at 2023-08-09 11:09:04 UTC