A 39 m long curved footbridge was built over the busy Hip Wo Street near the junction with Mut Wah Street in Kwun Tong, Hong Kong. It was highly commended for the NEC Transport Project of the Year Award in 2021. Which NEC contract do you think was used? #HongKong
Posted by Hawa S at 2023-03-15 15:40:28 UTC